top of page
BTO PACKAGES
3 Room $ 13,800.00
​
4 Room $ 15,800.00
​
5 Room $ 17,800.00
​​
___________________________________
​
FREE GIFT Worth Up To $ 2000. !!!
​
· 1 Cooker Hob (Kitchen)
· 1 Cooker Hood (Kitchen)
· 2 Instant Heater (Toilet)
· 2 Bidet Spray (Toilet)
· 2 Mirror Sets (Toilet)​
· Labour to install Cooker Hob,Hood and Oven
​
* Terms and Conditions apply
___________________________________
​
(A) Professional Service Provided
​
Project management
Site supervision during works progress
Design consultation and space planning
Materials and color proposal
Perspective Drawing for carpentry works
2 years Warranty after Sale service
​
(B) Masonry Works
​
7. Supply & construct kitchen cabinet base with side tiles finish
8. Supply & construct fridge base with homogeneous tiles finish
9. Supply & washing machine base with homogeneous tiles finish
(C) Plumbing Works
10. Supply & install inlet/outlet pipe for kitchen sink
11. Supply & install kitchen sink &tap
12. Labour to install bathroom accessories
13. Labour to install instant heater for 2 toilets
(D) Carpentry Works
14. Supply & install top & bottom kitchen cabinets with laminated finish 20ft
15. Supply & install 2-tiers stainless steel dish racks
16. Supply & install frosted glass door panel c/w hydraulic system
17. Supply & install 4 drawer c/w 1 set of cutlery tray
18. Supply and install soft closer hinges for all cabinets doors
All cabinets doors includes soft close hinges & ABS trimming finish
(E) Work Top Works
​
19. Supply & install solid surface worktop for kitchen cabinet size @ 10ft
Backsplash & profile and cut hole for cooking stove & sink are included
(F) Door Works
​
20. Supply & install bi-fold door for master & common bathroom
21. Supply & install classic door for all bedrooms
(G) Miscellaneous Works
​
22. Painting whole house wall, ceiling &pvc pipe with Nippon paint
23. Supply & install sliding windows at service yard 3 panel with 3 track
24. Supply and install aluminum window grille for whole house
25. Supply labour to re-install wiring at kitchen
26. Haulage ( uplifting materials)
27. Clearing of debris during renovation in progress& completed
28. Chemical wash & general cleaning upon completion of works
DOWNLOADS


bottom of page